Helios Technologies (HLIO) Construction in Progress (2016 - 2024)
Historic Construction in Progress for Helios Technologies (HLIO) over the last 13 years, with Q4 2024 value amounting to $27.2 million.
- Helios Technologies' Construction in Progress rose 501.93% to $27.2 million in Q4 2024 from the same period last year, while for Dec 2024 it was $27.2 million, marking a year-over-year increase of 501.93%. This contributed to the annual value of $27.2 million for FY2024, which is 501.93% up from last year.
- Latest data reveals that Helios Technologies reported Construction in Progress of $27.2 million as of Q4 2024, which was up 501.93% from $25.9 million recorded in Q4 2023.
- Helios Technologies' Construction in Progress' 5-year high stood at $27.2 million during Q4 2024, with a 5-year trough of $17.5 million in Q1 2021.
- Moreover, its 4-year median value for Construction in Progress was $20.7 million (2022), whereas its average is $22.1 million.
- In the last 5 years, Helios Technologies' Construction in Progress plummeted by 676.33% in 2022 and then soared by 3419.69% in 2023.
- Helios Technologies' Construction in Progress (Quarter) stood at $17.5 million in 2021, then grew by 10.12% to $19.3 million in 2022, then skyrocketed by 34.2% to $25.9 million in 2023, then grew by 5.02% to $27.2 million in 2024.
- Its Construction in Progress was $27.2 million in Q4 2024, compared to $25.9 million in Q4 2023 and $19.3 million in Q4 2022.