Cash Flow Statement
Growth Metrics

Harte Hanks (HHS) Construction in Progress (2016 - 2025)

Harte Hanks has reported Construction in Progress over the past 16 years, most recently at $1.6 million for Q4 2025.

  • Quarterly Construction in Progress fell 15.37% to $1.6 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $1.6 million through Dec 2025, down 15.37% year-over-year, with the annual reading at $1.6 million for FY2025, 15.37% down from the prior year.
  • Construction in Progress was $1.6 million for Q4 2025 at Harte Hanks, down from $1.9 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $8.9 million in Q4 2022 and troughed at $1.6 million in Q4 2025.
  • The 5-year median for Construction in Progress is $1.9 million (2024), against an average of $3.4 million.
  • Year-over-year, Construction in Progress surged 754.29% in 2021 and then crashed 79.41% in 2023.
  • A 5-year view of Construction in Progress shows it stood at $2.7 million in 2021, then surged by 232.48% to $8.9 million in 2022, then plummeted by 79.41% to $1.8 million in 2023, then increased by 3.47% to $1.9 million in 2024, then dropped by 15.37% to $1.6 million in 2025.
  • Per Business Quant, the three most recent readings for HHS's Construction in Progress are $1.6 million (Q4 2025), $1.9 million (Q4 2024), and $1.8 million (Q4 2023).