Growth Metrics

Harte Hanks (HHS) Construction in Progress (2016 - 2025)

Harte Hanks (HHS) has disclosed Construction in Progress for 14 consecutive years, with $1.9 million as the latest value for Q4 2024.

  • On a quarterly basis, Construction in Progress rose 3.47% to $1.9 million in Q4 2024 year-over-year; TTM through Dec 2024 was $1.9 million, a 3.47% increase, with the full-year FY2024 number at $1.9 million, up 3.47% from a year prior.
  • Construction in Progress was $1.9 million for Q4 2024 at Harte Hanks, up from $1.8 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $8.9 million in Q4 2022 to a low of $315000.0 in Q4 2020.
  • A 5-year average of $3.1 million and a median of $1.9 million in 2024 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: surged 754.29% in 2021, then crashed 79.41% in 2023.
  • Harte Hanks' Construction in Progress stood at $315000.0 in 2020, then soared by 754.29% to $2.7 million in 2021, then soared by 232.48% to $8.9 million in 2022, then tumbled by 79.41% to $1.8 million in 2023, then rose by 3.47% to $1.9 million in 2024.
  • Per Business Quant, the three most recent readings for HHS's Construction in Progress are $1.9 million (Q4 2024), $1.8 million (Q4 2023), and $8.9 million (Q4 2022).