Growth Metrics

Harte Hanks (HHS) Construction in Progress (2016 - 2024)

Historic Construction in Progress for Harte Hanks (HHS) over the last 14 years, with Q4 2024 value amounting to $1.9 million.

  • Harte Hanks' Construction in Progress rose 347.45% to $1.9 million in Q4 2024 from the same period last year, while for Dec 2024 it was $1.9 million, marking a year-over-year increase of 347.45%. This contributed to the annual value of $1.9 million for FY2024, which is 347.45% up from last year.
  • Latest data reveals that Harte Hanks reported Construction in Progress of $1.9 million as of Q4 2024, which was up 347.45% from $1.8 million recorded in Q4 2023.
  • Harte Hanks' 5-year Construction in Progress high stood at $8.9 million for Q4 2022, and its period low was $315000.0 during Q4 2020.
  • For the 5-year period, Harte Hanks' Construction in Progress averaged around $3.1 million, with its median value being $1.9 million (2024).
  • Per our database at Business Quant, Harte Hanks' Construction in Progress skyrocketed by 75428.57% in 2021 and then tumbled by 7941.21% in 2023.
  • Over the past 5 years, Harte Hanks' Construction in Progress (Quarter) stood at $315000.0 in 2020, then surged by 754.29% to $2.7 million in 2021, then surged by 232.48% to $8.9 million in 2022, then plummeted by 79.41% to $1.8 million in 2023, then grew by 3.47% to $1.9 million in 2024.
  • Its Construction in Progress stands at $1.9 million for Q4 2024, versus $1.8 million for Q4 2023 and $8.9 million for Q4 2022.