Growth Metrics

ZoomInfo Technologies (GTM) Restructuring Costs (2019 - 2024)

Historic Restructuring Costs for ZoomInfo Technologies (GTM) over the last 6 years, with Q1 2024 value amounting to $200000.0.

  • ZoomInfo Technologies' Restructuring Costs rose 10000.0% to $200000.0 in Q1 2024 from the same period last year, while for Mar 2024 it was $10.4 million, marking a year-over-year increase of 51176.47%. This contributed to the annual value of $10.3 million for FY2023, which is 15121.95% up from last year.
  • As of Q1 2024, ZoomInfo Technologies' Restructuring Costs stood at $200000.0, which was up 10000.0% from $400000.0 recorded in Q4 2023.
  • ZoomInfo Technologies' 5-year Restructuring Costs high stood at $11.0 million for Q3 2021, and its period low was -$100000.0 during Q3 2020.
  • Over the past 5 years, ZoomInfo Technologies' median Restructuring Costs value was $2.2 million (recorded in 2021), while the average stood at $3.1 million.
  • As far as peak fluctuations go, ZoomInfo Technologies' Restructuring Costs crashed by 10357.14% in 2020, and later skyrocketed by 1110000.0% in 2021.
  • Quarter analysis of 5 years shows ZoomInfo Technologies' Restructuring Costs stood at $1.5 million in 2020, then skyrocketed by 306.67% to $6.1 million in 2021, then tumbled by 95.08% to $300000.0 in 2022, then surged by 33.33% to $400000.0 in 2023, then tumbled by 50.0% to $200000.0 in 2024.
  • Its Restructuring Costs was $200000.0 in Q1 2024, compared to $400000.0 in Q4 2023 and $5.1 million in Q3 2023.