Growth Metrics

Greenland Technologies Holding (GTEC) Construction in Progress (2018 - 2025)

Greenland Technologies Holding's Construction in Progress history spans 8 years, with the latest figure at $10000.0 for Q4 2025.

  • For Q4 2025, Construction in Progress rose 69.89% year-over-year to $10000.0; the TTM value through Dec 2025 reached $10000.0, up 69.89%, while the annual FY2025 figure was $10000.0, 69.89% up from the prior year.
  • Construction in Progress reached $10000.0 in Q4 2025 per GTEC's latest filing, roughly flat from $10000.0 in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $414557.0 in Q3 2021 to a low of $0.01 in Q2 2025.
  • Average Construction in Progress over 5 years is $93888.1, with a median of $16661.0 recorded in 2022.
  • Peak YoY movement for Construction in Progress: plummeted 100.0% in 2021, then soared 29604900.0% in 2025.
  • A 5-year view of Construction in Progress shows it stood at $407199.0 in 2021, then plummeted by 95.81% to $17078.0 in 2022, then surged by 32.57% to $22641.0 in 2023, then crashed by 74.0% to $5886.0 in 2024, then surged by 69.89% to $10000.0 in 2025.
  • Per Business Quant, the three most recent readings for GTEC's Construction in Progress are $10000.0 (Q4 2025), $10000.0 (Q3 2025), and $0.01 (Q2 2025).