KPIs & Operating Metrics(New)
Growth Metrics

Groupon (GRPN) Construction in Progress (2016 - 2017)

Historic Construction in Progress for Groupon (GRPN) over the last 3 years, with Q4 2017 value amounting to $136000.0.

  • Groupon's Construction in Progress fell 8169.58% to $136000.0 in Q4 2017 from the same period last year, while for Dec 2017 it was $136000.0, marking a year-over-year decrease of 8169.58%. This contributed to the annual value of $136000.0 for FY2017, which is 8169.58% down from last year.
  • As of Q4 2017, Groupon's Construction in Progress stood at $136000.0, which was down 8169.58% from $743000.0 recorded in Q4 2016.
  • In the past 5 years, Groupon's Construction in Progress registered a high of $743000.0 during Q4 2016, and its lowest value of $136000.0 during Q4 2017.
  • For the 3-year period, Groupon's Construction in Progress averaged around $456000.0, with its median value being $489000.0 (2015).
  • Per our database at Business Quant, Groupon's Construction in Progress surged by 5194.27% in 2016 and then crashed by 8169.58% in 2017.
  • Groupon's Construction in Progress (Quarter) stood at $489000.0 in 2015, then soared by 51.94% to $743000.0 in 2016, then crashed by 81.7% to $136000.0 in 2017.
  • Its Construction in Progress was $136000.0 in Q4 2017, compared to $743000.0 in Q4 2016 and $489000.0 in Q4 2015.