Gentex (GNTX) Construction in Progress (2016 - 2025)
Gentex's Construction in Progress history spans 17 years, with the latest figure at $83.0 million for Q4 2025.
- For Q4 2025, Construction in Progress fell 53.32% year-over-year to $83.0 million; the TTM value through Dec 2025 reached $83.0 million, down 53.32%, while the annual FY2025 figure was $83.0 million, 53.32% down from the prior year.
- Construction in Progress reached $83.0 million in Q4 2025 per GNTX's latest filing, down from $177.9 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $177.9 million in Q4 2024 to a low of $77.6 million in Q4 2021.
- Average Construction in Progress over 5 years is $132.5 million, with a median of $158.3 million recorded in 2023.
- Peak YoY movement for Construction in Progress: skyrocketed 113.39% in 2022, then tumbled 53.32% in 2025.
- A 5-year view of Construction in Progress shows it stood at $77.6 million in 2021, then surged by 113.39% to $165.6 million in 2022, then fell by 4.38% to $158.3 million in 2023, then rose by 12.37% to $177.9 million in 2024, then tumbled by 53.32% to $83.0 million in 2025.
- Per Business Quant, the three most recent readings for GNTX's Construction in Progress are $83.0 million (Q4 2025), $177.9 million (Q4 2024), and $158.3 million (Q4 2023).