Graco (GGG) Construction in Progress (2016)
Graco (GGG) has disclosed Construction in Progress for 7 consecutive years, with $9.4 million as the latest value for Q4 2016.
- On a quarterly basis, Construction in Progress fell 52.25% to $9.4 million in Q4 2016 year-over-year; TTM through Dec 2016 was $9.4 million, a 52.25% decrease, with the full-year FY2016 number at $9.4 million, down 52.25% from a year prior.
- Construction in Progress was $9.4 million for Q4 2016 at Graco, down from $19.6 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $19.6 million in Q4 2015 to a low of $9.4 million in Q4 2016.
- A 5-year average of $13.0 million and a median of $12.1 million in 2014 define the central range for Construction in Progress.
- Peak YoY movement for Construction in Progress: skyrocketed 61.83% in 2015, then plummeted 52.25% in 2016.
- Graco's Construction in Progress stood at $9.6 million in 2012, then soared by 48.62% to $14.2 million in 2013, then fell by 14.81% to $12.1 million in 2014, then surged by 61.83% to $19.6 million in 2015, then tumbled by 52.25% to $9.4 million in 2016.
- Per Business Quant, the three most recent readings for GGG's Construction in Progress are $9.4 million (Q4 2016), $19.6 million (Q4 2015), and $12.1 million (Q4 2014).