Graco (GGG) Construction in Progress (2016)
Historic Construction in Progress for Graco (GGG) over the last 7 years, with Q4 2016 value amounting to $9.4 million.
- Graco's Construction in Progress fell 5224.64% to $9.4 million in Q4 2016 from the same period last year, while for Dec 2016 it was $9.4 million, marking a year-over-year decrease of 5224.64%. This contributed to the annual value of $9.4 million for FY2016, which is 5224.64% down from last year.
- Graco's Construction in Progress amounted to $9.4 million in Q4 2016, which was down 5224.64% from $19.6 million recorded in Q4 2015.
- In the past 5 years, Graco's Construction in Progress ranged from a high of $19.6 million in Q4 2015 and a low of $9.4 million during Q4 2016
- Moreover, its 5-year median value for Construction in Progress was $12.1 million (2014), whereas its average is $13.0 million.
- Its Construction in Progress has fluctuated over the past 5 years, first surged by 6183.05% in 2015, then plummeted by 5224.64% in 2016.
- Graco's Construction in Progress (Quarter) stood at $9.6 million in 2012, then surged by 48.62% to $14.2 million in 2013, then decreased by 14.81% to $12.1 million in 2014, then soared by 61.83% to $19.6 million in 2015, then crashed by 52.25% to $9.4 million in 2016.
- Its last three reported values are $9.4 million in Q4 2016, $19.6 million for Q4 2015, and $12.1 million during Q4 2014.