Graco (GGG) Construction in Progress (2016)
Graco (GGG) has disclosed Construction in Progress for 7 consecutive years, with $9.4 million as the latest value for Q4 2016.
- Quarterly Construction in Progress fell 52.25% to $9.4 million in Q4 2016 from the year-ago period, while the trailing twelve-month figure was $9.4 million through Dec 2016, down 52.25% year-over-year, with the annual reading at $9.4 million for FY2016, 52.25% down from the prior year.
- Construction in Progress for Q4 2016 was $9.4 million at Graco, down from $19.6 million in the prior quarter.
- The five-year high for Construction in Progress was $19.6 million in Q4 2015, with the low at $9.4 million in Q4 2016.
- Average Construction in Progress over 5 years is $13.0 million, with a median of $12.1 million recorded in 2014.
- The sharpest move saw Construction in Progress surged 61.83% in 2015, then tumbled 52.25% in 2016.
- Over 5 years, Construction in Progress stood at $9.6 million in 2012, then skyrocketed by 48.62% to $14.2 million in 2013, then dropped by 14.81% to $12.1 million in 2014, then soared by 61.83% to $19.6 million in 2015, then crashed by 52.25% to $9.4 million in 2016.
- According to Business Quant data, Construction in Progress over the past three periods came in at $9.4 million, $19.6 million, and $12.1 million for Q4 2016, Q4 2015, and Q4 2014 respectively.