Graco (GGG) Construction in Progress (2016)
Graco has reported Construction in Progress over the past 7 years, most recently at $9.4 million for Q4 2016.
- Quarterly Construction in Progress fell 52.25% to $9.4 million in Q4 2016 from the year-ago period, while the trailing twelve-month figure was $9.4 million through Dec 2016, down 52.25% year-over-year, with the annual reading at $9.4 million for FY2016, 52.25% down from the prior year.
- Construction in Progress was $9.4 million for Q4 2016 at Graco, down from $19.6 million in the prior quarter.
- Over five years, Construction in Progress peaked at $19.6 million in Q4 2015 and troughed at $9.4 million in Q4 2016.
- The 5-year median for Construction in Progress is $12.1 million (2014), against an average of $13.0 million.
- Year-over-year, Construction in Progress skyrocketed 61.83% in 2015 and then plummeted 52.25% in 2016.
- A 5-year view of Construction in Progress shows it stood at $9.6 million in 2012, then surged by 48.62% to $14.2 million in 2013, then decreased by 14.81% to $12.1 million in 2014, then skyrocketed by 61.83% to $19.6 million in 2015, then plummeted by 52.25% to $9.4 million in 2016.
- Per Business Quant, the three most recent readings for GGG's Construction in Progress are $9.4 million (Q4 2016), $19.6 million (Q4 2015), and $12.1 million (Q4 2014).