Genesco (GCO) Construction in Progress (2016 - 2026)
Genesco has reported Construction in Progress over the past 17 years, most recently at $8.3 million for Q1 2026.
- Quarterly results put Construction in Progress at $8.3 million for Q1 2026, down 19.51% from a year ago — trailing twelve months through Jan 2026 was $8.3 million (down 19.51% YoY), and the annual figure for FY2026 was $8.3 million, down 19.51%.
- Construction in Progress for Q1 2026 was $8.3 million at Genesco, down from $10.4 million in the prior quarter.
- Over the last five years, Construction in Progress for GCO hit a ceiling of $42.9 million in Q1 2022 and a floor of $4.6 million in Q1 2024.
- Median Construction in Progress over the past 5 years was $10.4 million (2025), compared with a mean of $20.5 million.
- Biggest five-year swings in Construction in Progress: surged 197.48% in 2022 and later plummeted 87.28% in 2024.
- Genesco's Construction in Progress stood at $42.9 million in 2022, then dropped by 15.49% to $36.3 million in 2023, then plummeted by 87.28% to $4.6 million in 2024, then soared by 124.63% to $10.4 million in 2025, then dropped by 19.51% to $8.3 million in 2026.
- The last three reported values for Construction in Progress were $8.3 million (Q1 2026), $10.4 million (Q1 2025), and $4.6 million (Q1 2024) per Business Quant data.