Growth Metrics

Genesco (GCO) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Genesco (GCO) over the last 16 years, with Q1 2025 value amounting to $10.4 million.

  • Genesco's Construction in Progress rose 12462.61% to $10.4 million in Q1 2025 from the same period last year, while for Feb 2025 it was $10.4 million, marking a year-over-year increase of 12462.61%. This contributed to the annual value of $10.4 million for FY2025, which is 12462.61% up from last year.
  • Latest data reveals that Genesco reported Construction in Progress of $10.4 million as of Q1 2025, which was up 12462.61% from $4.6 million recorded in Q1 2024.
  • Genesco's 5-year Construction in Progress high stood at $42.9 million for Q1 2022, and its period low was $4.6 million during Q1 2024.
  • Moreover, its 5-year median value for Construction in Progress was $14.4 million (2021), whereas its average is $21.7 million.
  • As far as peak fluctuations go, Genesco's Construction in Progress soared by 19748.3% in 2022, and later tumbled by 8727.66% in 2024.
  • Genesco's Construction in Progress (Quarter) stood at $14.4 million in 2021, then surged by 197.48% to $42.9 million in 2022, then fell by 15.49% to $36.3 million in 2023, then plummeted by 87.28% to $4.6 million in 2024, then skyrocketed by 124.63% to $10.4 million in 2025.
  • Its Construction in Progress was $10.4 million in Q1 2025, compared to $4.6 million in Q1 2024 and $36.3 million in Q1 2023.