Forward Air (FWRD) Construction in Progress (2016 - 2020)
Historic Construction in Progress for Forward Air (FWRD) over the last 12 years, with Q4 2020 value amounting to $4.1 million.
- Forward Air's Construction in Progress rose 11978.32% to $4.1 million in Q4 2020 from the same period last year, while for Dec 2020 it was $4.1 million, marking a year-over-year increase of 11978.32%. This contributed to the annual value of $4.1 million for FY2020, which is 11978.32% up from last year.
- Forward Air's Construction in Progress amounted to $4.1 million in Q4 2020, which was up 11978.32% from $1.8 million recorded in Q4 2019.
- In the past 5 years, Forward Air's Construction in Progress registered a high of $12.7 million during Q4 2017, and its lowest value of $1.8 million during Q4 2019.
- Over the past 5 years, Forward Air's median Construction in Progress value was $5.3 million (recorded in 2018), while the average stood at $7.2 million.
- As far as peak fluctuations go, Forward Air's Construction in Progress plummeted by 6528.69% in 2019, and later surged by 11978.32% in 2020.
- Quarter analysis of 5 years shows Forward Air's Construction in Progress stood at $12.1 million in 2016, then increased by 4.74% to $12.7 million in 2017, then crashed by 57.99% to $5.3 million in 2018, then plummeted by 65.29% to $1.8 million in 2019, then surged by 119.78% to $4.1 million in 2020.
- Its Construction in Progress stands at $4.1 million for Q4 2020, versus $1.8 million for Q4 2019 and $5.3 million for Q4 2018.