Forward Air (FWRD) Construction in Progress (2016 - 2020)
Forward Air filings provide 12 years of Construction in Progress readings, the most recent being $4.1 million for Q4 2020.
- On a quarterly basis, Construction in Progress rose 119.78% to $4.1 million in Q4 2020 year-over-year; TTM through Dec 2020 was $4.1 million, a 119.78% increase, with the full-year FY2020 number at $4.1 million, up 119.78% from a year prior.
- Construction in Progress hit $4.1 million in Q4 2020 for Forward Air, up from $1.8 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $12.7 million in Q4 2017 to a low of $1.8 million in Q4 2019.
- Median Construction in Progress over the past 5 years was $5.3 million (2018), compared with a mean of $7.2 million.
- Biggest five-year swings in Construction in Progress: plummeted 65.29% in 2019 and later skyrocketed 119.78% in 2020.
- Forward Air's Construction in Progress stood at $12.1 million in 2016, then increased by 4.74% to $12.7 million in 2017, then crashed by 57.99% to $5.3 million in 2018, then plummeted by 65.29% to $1.8 million in 2019, then skyrocketed by 119.78% to $4.1 million in 2020.
- The last three reported values for Construction in Progress were $4.1 million (Q4 2020), $1.8 million (Q4 2019), and $5.3 million (Q4 2018) per Business Quant data.