Forward Air (FWRD) Construction in Progress (2016 - 2020)
Forward Air's Construction in Progress history spans 12 years, with the latest figure at $4.1 million for Q4 2020.
- For Q4 2020, Construction in Progress rose 119.78% year-over-year to $4.1 million; the TTM value through Dec 2020 reached $4.1 million, up 119.78%, while the annual FY2020 figure was $4.1 million, 119.78% up from the prior year.
- Construction in Progress reached $4.1 million in Q4 2020 per FWRD's latest filing, up from $1.8 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $12.7 million in Q4 2017 to a low of $1.8 million in Q4 2019.
- Average Construction in Progress over 5 years is $7.2 million, with a median of $5.3 million recorded in 2018.
- Peak YoY movement for Construction in Progress: crashed 65.29% in 2019, then soared 119.78% in 2020.
- A 5-year view of Construction in Progress shows it stood at $12.1 million in 2016, then increased by 4.74% to $12.7 million in 2017, then crashed by 57.99% to $5.3 million in 2018, then plummeted by 65.29% to $1.8 million in 2019, then skyrocketed by 119.78% to $4.1 million in 2020.
- Per Business Quant, the three most recent readings for FWRD's Construction in Progress are $4.1 million (Q4 2020), $1.8 million (Q4 2019), and $5.3 million (Q4 2018).