Fst (FSTWF) Construction in Progress (2023 - 2024)
Historic Construction in Progress for Fst (FSTWF) over the last 2 years, with Q4 2024 value amounting to $971267.0.
- Fst's Construction in Progress fell 3902.31% to $971267.0 in Q4 2024 from the same period last year, while for Dec 2024 it was $971267.0, marking a year-over-year decrease of 3902.31%. This contributed to the annual value of $971267.0 for FY2024, which is 3902.31% down from last year.
- According to the latest figures from Q4 2024, Fst's Construction in Progress is $971267.0, which was down 3902.31% from $1.6 million recorded in Q4 2023.
- Over the past 5 years, Fst's Construction in Progress peaked at $1.6 million during Q4 2023, and registered a low of $971267.0 during Q4 2024.