Algoma Steel (ASTL) Construction in Progress (2022 - 2024)
Algoma Steel's Construction in Progress history spans 3 years, with the latest figure at $44.0 million for Q1 2024.
- For Q1 2024, Construction in Progress rose 79.74% year-over-year to $44.0 million; the TTM value through Mar 2024 reached $44.0 million, up 79.74%, while the annual FY2024 figure was $44.0 million, 79.74% up from the prior year.
- Construction in Progress reached $44.0 million in Q1 2024 per ASTL's latest filing, up from $24.5 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $44.0 million in Q1 2024 to a low of $24.5 million in Q1 2023.
- Average Construction in Progress over 3 years is $36.4 million, with a median of $40.6 million recorded in 2022.
- Peak YoY movement for Construction in Progress: crashed 39.66% in 2023, then surged 79.74% in 2024.
- A 3-year view of Construction in Progress shows it stood at $40.6 million in 2022, then plummeted by 39.66% to $24.5 million in 2023, then soared by 79.74% to $44.0 million in 2024.
- Per Business Quant, the three most recent readings for ASTL's Construction in Progress are $44.0 million (Q1 2024), $24.5 million (Q1 2023), and $40.6 million (Q1 2022).