Algoma Steel ASTL
NASDAQ ASTL
$4.66 +0.11 (+2.30%)
As of: Aug 21, 2026 · 3:34 PM EDT

Algoma Steel Group Inc. (ASTL) Construction in Progress (2022 - 2024)

Algoma Steel's (ASTL) quarterly Construction in Progress came in at $44.0 million in Q1 2024, up 79.74% YoY from $24.5 million in Q2 2023, and up 79.74% on a QoQ basis from $24.5 million in Q1 2023.

Algoma Steel Group Inc. (ASTL) Construction in Progress (2022 - 2024) Analysis & Trends

Algoma Steel (ASTL) has 3 years of Construction in Progress data on file, last reported at $44.0 million in Q1 2024.

  • Quarterly Construction in Progress rose 79.74% year-over-year to $44.0 million in Q1 2024, while the trailing twelve-month figure through Mar 2024 was $44.0 million (up 79.74% YoY) and the FY2024 annual result came in at $44.0 million, up 79.74% from the prior year.
  • Construction in Progress grew to $44.0 million in Q1 2024, from $24.5 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $44.0 million in Q1 2024 to a low of $24.5 million in Q1 2023.
  • A 3-year average of $36.4 million and a median of $40.6 million in 2022 frame the typical range for Construction in Progress.
  • Annual changes were most pronounced in 2023 — Construction in Progress tumbled 39.66% — and 2024, when it surged 79.74%.
  • Tracing ASTL's Construction in Progress over 3 years: stood at $40.6 million in 2022, then slumped by 39.66% to $24.5 million in 2023, then jumped by 79.74% to $44.0 million in 2024.
  • The last three Construction in Progress figures came in at $44.0 million (Q1 2024), $24.5 million (Q1 2023), and $40.6 million (Q1 2022), per Business Quant data.

Peer Comparison

Historic Data

Download Data
DateValue
Mar 31, 2024 44.01 Mn
Mar 31, 2023 24.48 Mn
Mar 31, 2022 40.58 Mn