Frontline (FRO) Construction in Progress (2016 - 2022)
Frontline's Construction in Progress history spans 14 years, with the latest figure at $48.0 million for Q4 2022.
- For Q4 2022, Construction in Progress fell 63.26% year-over-year to $48.0 million; the TTM value through Dec 2022 reached $48.0 million, down 63.26%, while the annual FY2022 figure was $48.0 million, 63.26% down from the prior year.
- Construction in Progress reached $48.0 million in Q4 2022 per FRO's latest filing, down from $130.6 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $130.6 million in Q4 2021 to a low of $46.1 million in Q4 2019.
- Average Construction in Progress over 5 years is $65.1 million, with a median of $48.5 million recorded in 2020.
- Peak YoY movement for Construction in Progress: skyrocketed 169.36% in 2021, then plummeted 63.26% in 2022.
- A 5-year view of Construction in Progress shows it stood at $52.3 million in 2018, then decreased by 11.84% to $46.1 million in 2019, then rose by 5.27% to $48.5 million in 2020, then surged by 169.36% to $130.6 million in 2021, then tumbled by 63.26% to $48.0 million in 2022.
- Per Business Quant, the three most recent readings for FRO's Construction in Progress are $48.0 million (Q4 2022), $130.6 million (Q4 2021), and $48.5 million (Q4 2020).