Fly-E (FLYE) Construction in Progress (2024)
Historic Construction in Progress for Fly-E (FLYE) over the last 1 years, with Q4 2024 value amounting to $1.9 million.
- Fly-E's Construction in Progress changed N/A to $1.9 million in Q4 2024 from the same period last year, while for Dec 2024 it was $1.9 million, marking a year-over-year change of. This contributed to the annual value of $275000.0 for FY2024, which is N/A changed from last year.
- Fly-E's Construction in Progress amounted to $1.9 million in Q4 2024.
- Fly-E's Construction in Progress' 5-year high stood at $1.9 million during Q4 2024, with a 5-year trough of $275000.0 in Q1 2024.