Growth Metrics

Fly-E (FLYE) Construction in Progress (2024)

Fly-E (FLYE) has disclosed Construction in Progress for 1 consecutive years, with $1.9 million as the latest value for Q4 2024.

  • On a quarterly basis, Construction in Progress changed N/A to $1.9 million in Q4 2024 year-over-year; TTM through Dec 2024 was $1.9 million, a N/A change, with the full-year FY2024 number at $275000.0, changed N/A from a year prior.
  • Construction in Progress was $1.9 million for Q4 2024 at Fly-E, up from $1.3 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $1.9 million in Q4 2024 to a low of $275000.0 in Q1 2024.