Growth Metrics

Fti Consulting (FCN) Construction in Progress (2016)

Fti Consulting's Construction in Progress history spans 7 years, with the latest figure at $2.3 million for Q4 2016.

  • On a quarterly basis, Construction in Progress rose 9.41% to $2.3 million in Q4 2016 year-over-year; TTM through Dec 2016 was $2.3 million, a 9.41% increase, with the full-year FY2016 number at $2.3 million, up 9.41% from a year prior.
  • Construction in Progress hit $2.3 million in Q4 2016 for Fti Consulting, up from $2.1 million in the prior quarter.
  • Over the last five years, Construction in Progress for FCN hit a ceiling of $18.5 million in Q4 2013 and a floor of $2.1 million in Q4 2015.
  • Historically, Construction in Progress has averaged $6.6 million across 5 years, with a median of $2.9 million in 2012.
  • Biggest five-year swings in Construction in Progress: skyrocketed 540.89% in 2013 and later tumbled 70.61% in 2015.
  • Tracing FCN's Construction in Progress over 5 years: stood at $2.9 million in 2012, then skyrocketed by 540.89% to $18.5 million in 2013, then tumbled by 60.46% to $7.3 million in 2014, then tumbled by 70.61% to $2.1 million in 2015, then rose by 9.41% to $2.3 million in 2016.
  • Business Quant data shows Construction in Progress for FCN at $2.3 million in Q4 2016, $2.1 million in Q4 2015, and $7.3 million in Q4 2014.