Growth Metrics

Spectral Capital (FCCN) Construction in Progress (2025 - 2026)

Spectral Capital has reported Construction in Progress over the past 1 years, most recently at $439264.0 for Q4 2025.

  • For Q4 2025, Construction in Progress changed N/A year-over-year to $439264.0; the TTM value through Dec 2025 reached $439264.0, changed N/A, while the annual FY2025 figure was $439264.0, N/A changed from the prior year.
  • Construction in Progress for Q4 2025 was $439264.0 at Spectral Capital, up from $309713.0 in the prior quarter.
  • Over five years, Construction in Progress peaked at $439264.0 in Q4 2025 and troughed at $309713.0 in Q3 2025.