Growth Metrics

Farmer Brothers (FARM) Construction in Progress (2016)

Historic Construction in Progress for Farmer Brothers (FARM) over the last 4 years, with Q4 2016 value amounting to $76.9 million.

  • Farmer Brothers' Construction in Progress changed N/A to $76.9 million in Q4 2016 from the same period last year, while for Dec 2016 it was $76.9 million, marking a year-over-year change of. This contributed to the annual value of $39.3 million for FY2016, which is 147200.0% up from last year.
  • Farmer Brothers' Construction in Progress amounted to $76.9 million in Q4 2016.
  • Farmer Brothers' 5-year Construction in Progress high stood at $76.9 million for Q4 2016, and its period low was $2.5 million during Q2 2015.
  • Its 4-year average for Construction in Progress is $24.9 million, with a median of $3.1 million in 2013.
  • As far as peak fluctuations go, Farmer Brothers' Construction in Progress plummeted by 1071.43% in 2015, and later skyrocketed by 147200.0% in 2016.
  • Over the past 4 years, Farmer Brothers' Construction in Progress (Quarter) stood at $3.1 million in 2013, then dropped by 9.68% to $2.8 million in 2014, then decreased by 10.71% to $2.5 million in 2015, then skyrocketed by 2976.0% to $76.9 million in 2016.
  • Its last three reported values are $76.9 million in Q4 2016, $39.3 million for Q2 2016, and $2.5 million during Q2 2015.