Farmer Brothers (FARM) Construction in Progress (2016)
Farmer Brothers' Construction in Progress history spans 4 years, with the latest figure at $76.9 million for Q4 2016.
- On a quarterly basis, Construction in Progress changed N/A to $76.9 million in Q4 2016 year-over-year; TTM through Dec 2016 was $76.9 million, a N/A change, with the full-year FY2016 number at $39.3 million, up 1472.0% from a year prior.
- Construction in Progress hit $76.9 million in Q4 2016 for Farmer Brothers, up from $39.3 million in the prior quarter.
- Over the last five years, Construction in Progress for FARM hit a ceiling of $76.9 million in Q4 2016 and a floor of $2.5 million in Q2 2015.
- Historically, Construction in Progress has averaged $24.9 million across 4 years, with a median of $3.1 million in 2013.
- Biggest five-year swings in Construction in Progress: fell 10.71% in 2015 and later soared 1472.0% in 2016.
- Tracing FARM's Construction in Progress over 4 years: stood at $3.1 million in 2013, then fell by 9.68% to $2.8 million in 2014, then dropped by 10.71% to $2.5 million in 2015, then soared by 2976.0% to $76.9 million in 2016.
- Business Quant data shows Construction in Progress for FARM at $76.9 million in Q4 2016, $39.3 million in Q2 2016, and $2.5 million in Q2 2015.