Esg (ESGH) Construction in Progress (2023 - 2024)
Esg (ESGH) has disclosed Construction in Progress for 2 consecutive years, with $90809.0 as the latest value for Q4 2024.
- On a quarterly basis, Construction in Progress rose 318.82% to $90809.0 in Q4 2024 year-over-year; TTM through Dec 2024 was $90809.0, a 318.82% increase, with the full-year FY2024 number at $90809.0, up 318.82% from a year prior.
- Construction in Progress was $90809.0 for Q4 2024 at Esg, up from $21682.0 in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $90809.0 in Q4 2024 to a low of $21682.0 in Q4 2023.