Sunrise New Energy (EPOW) Construction in Progress (2021 - 2025)

Historic Construction in Progress for Sunrise New Energy (EPOW) over the last 5 years, with Q2 2025 value amounting to $62.8 million.

  • Sunrise New Energy's Construction in Progress rose 109.5% to $62.8 million in Q2 2025 from the same period last year, while for Jun 2025 it was $62.8 million, marking a year-over-year increase of 109.5%. This contributed to the annual value of $60.5 million for FY2024, which is 241954.83% up from last year.
  • Latest data reveals that Sunrise New Energy reported Construction in Progress of $62.8 million as of Q2 2025, which was up 109.5% from $60.5 million recorded in Q4 2024.
  • In the past 5 years, Sunrise New Energy's Construction in Progress ranged from a high of $62.8 million in Q2 2025 and a low of $2.4 million during Q4 2023
  • Over the past 5 years, Sunrise New Energy's median Construction in Progress value was $30.5 million (recorded in 2022), while the average stood at $33.8 million.
  • Per our database at Business Quant, Sunrise New Energy's Construction in Progress tumbled by 8807.39% in 2023 and then soared by 241954.83% in 2024.
  • Over the past 5 years, Sunrise New Energy's Construction in Progress (Quarter) stood at $3.4 million in 2021, then soared by 500.81% to $20.1 million in 2022, then tumbled by 88.07% to $2.4 million in 2023, then skyrocketed by 2419.55% to $60.5 million in 2024, then rose by 3.85% to $62.8 million in 2025.
  • Its Construction in Progress stands at $62.8 million for Q2 2025, versus $60.5 million for Q4 2024 and $62.1 million for Q2 2024.