KPIs & Operating Metrics(New)
Growth Metrics

EPAM Systems (EPAM) Construction in Progress: 2011-2012

Historic Construction in Progress for Systems (EPAM) over the last 2 years, with Dec 2012 value amounting to $15.6 million.

  • Systems' Construction in Progress rose 907.18% to $15.6 million in Q4 2012 from the same period last year, while for Dec 2012 it was $15.6 million, marking a year-over-year increase of 907.18%. This contributed to the annual value of $15.6 million for FY2012, which is 907.18% up from last year.
  • As of FY2012, Systems' Construction in Progress stood at $15.6 million, which was up 907.18% from $1.5 million recorded in FY2011.
  • Systems' 5-year Construction in Progress high stood at $15.6 million for FY2012, and its period low was $1.5 million during FY2011.
  • In the last 2 years, Systems' Construction in Progress had a median value of $8.6 million in 2011 and averaged $8.6 million.
  • Data for Systems' Construction in Progress shows a peak YoY spiked of 907.18% (in 2012) over the last 5 years.
  • Yearly analysis of 2 years shows Systems' Construction in Progress stood at $1.5 million in 2011, then surged by 907.18% to $15.6 million in 2012.