Graftech International (EAF) Construction in Progress (2016 - 2025)
Graftech International (EAF) has disclosed Construction in Progress for 16 consecutive years, with $53.2 million as the latest value for Q4 2025.
- On a quarterly basis, Construction in Progress rose 22.52% to $53.2 million in Q4 2025 year-over-year; TTM through Dec 2025 was $53.2 million, a 22.52% increase, with the full-year FY2025 number at $53.2 million, up 22.52% from a year prior.
- Construction in Progress was $53.2 million for Q4 2025 at Graftech International, up from $43.4 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $82.8 million in Q4 2022 to a low of $43.4 million in Q4 2024.
- A 5-year average of $61.9 million and a median of $64.6 million in 2021 define the central range for Construction in Progress.
- Peak YoY movement for Construction in Progress: skyrocketed 95.27% in 2021, then plummeted 33.93% in 2024.
- Graftech International's Construction in Progress stood at $64.6 million in 2021, then increased by 28.14% to $82.8 million in 2022, then decreased by 20.71% to $65.7 million in 2023, then tumbled by 33.93% to $43.4 million in 2024, then increased by 22.52% to $53.2 million in 2025.
- Per Business Quant, the three most recent readings for EAF's Construction in Progress are $53.2 million (Q4 2025), $43.4 million (Q4 2024), and $65.7 million (Q4 2023).