Graftech International (EAF) Construction in Progress (2016 - 2025)
Graftech International (EAF) has disclosed Construction in Progress for 16 consecutive years, with $53.2 million as the latest value for Q4 2025.
- Quarterly Construction in Progress rose 22.52% to $53.2 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $53.2 million through Dec 2025, up 22.52% year-over-year, with the annual reading at $53.2 million for FY2025, 22.52% up from the prior year.
- Construction in Progress for Q4 2025 was $53.2 million at Graftech International, up from $43.4 million in the prior quarter.
- The five-year high for Construction in Progress was $82.8 million in Q4 2022, with the low at $43.4 million in Q4 2024.
- Average Construction in Progress over 5 years is $61.9 million, with a median of $64.6 million recorded in 2021.
- The sharpest move saw Construction in Progress surged 95.27% in 2021, then tumbled 33.93% in 2024.
- Over 5 years, Construction in Progress stood at $64.6 million in 2021, then rose by 28.14% to $82.8 million in 2022, then fell by 20.71% to $65.7 million in 2023, then crashed by 33.93% to $43.4 million in 2024, then rose by 22.52% to $53.2 million in 2025.
- According to Business Quant data, Construction in Progress over the past three periods came in at $53.2 million, $43.4 million, and $65.7 million for Q4 2025, Q4 2024, and Q4 2023 respectively.