Growth Metrics

Driveitaway Holdings (DWAY) Construction in Progress (2017 - 2018)

Historic Construction in Progress for Driveitaway Holdings (DWAY) over the last 3 years, with Q3 2018 value amounting to $186826.0.

  • Driveitaway Holdings' Construction in Progress rose 92263.94% to $186826.0 in Q3 2018 from the same period last year, while for Sep 2018 it was $186826.0, marking a year-over-year increase of 92263.94%. This contributed to the annual value of $186826.0 for FY2018, which is 92263.94% up from last year.
  • As of Q3 2018, Driveitaway Holdings' Construction in Progress stood at $186826.0, which was up 92263.94% from $18269.0 recorded in Q3 2017.
  • Driveitaway Holdings' 5-year Construction in Progress high stood at $186826.0 for Q3 2018, and its period low was $18269.0 during Q3 2017.
  • Moreover, its 3-year median value for Construction in Progress was $36443.0 (2014), whereas its average is $80512.7.
  • Examining YoY changes over the last 5 years, Driveitaway Holdings' Construction in Progress showed a top increase of 92263.94% in 2018 and a maximum decrease of 92263.94% in 2018.
  • Driveitaway Holdings' Construction in Progress (Quarter) stood at $36443.0 in 2014, then plummeted by 49.87% to $18269.0 in 2017, then surged by 922.64% to $186826.0 in 2018.
  • Its last three reported values are $186826.0 in Q3 2018, $18269.0 for Q3 2017, and $36443.0 during Q3 2014.