Driveitaway Holdings (DWAY) Construction in Progress (2017 - 2018)
Driveitaway Holdings (DWAY) has 3 years of Construction in Progress data on record, last reported at $186826.0 in Q3 2018.
- For Q3 2018, Construction in Progress rose 922.64% year-over-year to $186826.0; the TTM value through Sep 2018 reached $186826.0, up 922.64%, while the annual FY2018 figure was $186826.0, 922.64% up from the prior year.
- Construction in Progress reached $186826.0 in Q3 2018 per DWAY's latest filing, up from $18269.0 in the prior quarter.
- Across five years, Construction in Progress topped out at $186826.0 in Q3 2018 and bottomed at $18269.0 in Q3 2017.
- Average Construction in Progress over 3 years is $80512.7, with a median of $36443.0 recorded in 2014.
- The widest YoY moves for Construction in Progress: up 922.64% in 2018, down 922.64% in 2018.
- A 3-year view of Construction in Progress shows it stood at $36443.0 in 2014, then plummeted by 49.87% to $18269.0 in 2017, then soared by 922.64% to $186826.0 in 2018.
- Per Business Quant database, its latest 3 readings for Construction in Progress were $186826.0 in Q3 2018, $18269.0 in Q3 2017, and $36443.0 in Q3 2014.