Growth Metrics

Driveitaway Holdings (DWAY) Construction in Progress (2017 - 2018)

Driveitaway Holdings has reported Construction in Progress over the past 3 years, most recently at $186826.0 for Q3 2018.

  • Quarterly results put Construction in Progress at $186826.0 for Q3 2018, up 922.64% from a year ago — trailing twelve months through Sep 2018 was $186826.0 (up 922.64% YoY), and the annual figure for FY2018 was $186826.0, up 922.64%.
  • Construction in Progress for Q3 2018 was $186826.0 at Driveitaway Holdings, up from $18269.0 in the prior quarter.
  • Over the last five years, Construction in Progress for DWAY hit a ceiling of $186826.0 in Q3 2018 and a floor of $18269.0 in Q3 2017.
  • Median Construction in Progress over the past 3 years was $36443.0 (2014), compared with a mean of $80512.7.
  • Peak annual rise in Construction in Progress hit 922.64% in 2018, while the deepest fall reached 922.64% in 2018.
  • Driveitaway Holdings' Construction in Progress stood at $36443.0 in 2014, then tumbled by 49.87% to $18269.0 in 2017, then skyrocketed by 922.64% to $186826.0 in 2018.
  • The last three reported values for Construction in Progress were $186826.0 (Q3 2018), $18269.0 (Q3 2017), and $36443.0 (Q3 2014) per Business Quant data.