Growth Metrics

DHT Holdings (DHT) Construction in Progress: 2014-2024

Historic Construction in Progress for Holdings (DHT) over the last 6 years, with Dec 2024 value amounting to $93.2 million.

  • Holdings' Construction in Progress rose 346.82% to $190.9 million in Q3 2025 from the same period last year, while for Sep 2025 it was $190.9 million, marking a year-over-year increase of 346.82%. This contributed to the annual value of $93.2 million for FY2024, which is N/A change from last year.
  • Latest data reveals that Holdings reported Construction in Progress of $93.2 million as of FY2024, which was up 141.78% from -$223.0 million recorded in FY2018.
  • Holdings' 5-year Construction in Progress high stood at $93.2 million for FY2024, and its period low was $93.2 million during FY2024.
  • Its 1-year average for Construction in Progress is $93.2 million, with a median of $93.2 million in 2024.