Growth Metrics

DHT Holdings (DHT) Construction in Progress (2016 - 2026)

DHT Holdings has reported Construction in Progress over the past 9 years, most recently at $55.7 million for Q1 2026.

  • For Q1 2026, Construction in Progress fell 53.86% year-over-year to $55.7 million; the TTM value through Mar 2026 reached $55.7 million, down 53.86%, while the annual FY2025 figure was $301.7 million, 223.74% up from the prior year.
  • Construction in Progress for Q1 2026 was $55.7 million at DHT Holdings, down from $301.7 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $301.7 million in Q4 2025 and troughed at $43000.0 in Q1 2024.
  • A 3-year average of $117.1 million and a median of $93.2 million in 2024 define the central range for Construction in Progress.
  • Biggest five-year swings in Construction in Progress: soared 280548.84% in 2025 and later plummeted 53.86% in 2026.
  • Year by year, Construction in Progress stood at $93.2 million in 2024, then soared by 223.74% to $301.7 million in 2025, then crashed by 81.54% to $55.7 million in 2026.
  • Business Quant data shows Construction in Progress for DHT at $55.7 million in Q1 2026, $301.7 million in Q4 2025, and $190.9 million in Q3 2025.