Growth Metrics

Cryoport (CYRX) Construction in Progress (2016 - 2023)

Cryoport (CYRX) has disclosed Construction in Progress for 8 consecutive years, with $24.2 million as the latest value for Q4 2023.

  • Quarterly Construction in Progress rose 51.9% to $24.2 million in Q4 2023 from the year-ago period, while the trailing twelve-month figure was $24.2 million through Dec 2023, up 51.9% year-over-year, with the annual reading at $24.2 million for FY2023, 51.9% up from the prior year.
  • Construction in Progress for Q4 2023 was $24.2 million at Cryoport, up from $15.9 million in the prior quarter.
  • The five-year high for Construction in Progress was $24.2 million in Q4 2023, with the low at $3.4 million in Q4 2019.
  • Average Construction in Progress over 5 years is $12.0 million, with a median of $8.6 million recorded in 2021.
  • The sharpest move saw Construction in Progress surged 147.8% in 2019, then grew 6.36% in 2021.
  • Over 5 years, Construction in Progress stood at $3.4 million in 2019, then skyrocketed by 136.87% to $8.1 million in 2020, then increased by 6.36% to $8.6 million in 2021, then surged by 85.8% to $15.9 million in 2022, then soared by 51.9% to $24.2 million in 2023.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $24.2 million, $15.9 million, and $8.6 million for Q4 2023, Q4 2022, and Q4 2021 respectively.