Chicago Rivet & Machine (CVR) Buildings (2016 - 2025)
Chicago Rivet & Machine has reported Buildings over the past 16 years, most recently at $5.7 million for Q4 2025.
- Quarterly results put Buildings at $5.7 million for Q4 2025, down 6.74% from a year ago — trailing twelve months through Dec 2025 was $5.7 million (down 6.74% YoY), and the annual figure for FY2025 was $5.7 million, down 6.74%.
- Buildings for Q4 2025 was $5.7 million at Chicago Rivet & Machine, down from $6.1 million in the prior quarter.
- Over the last five years, Buildings for CVR hit a ceiling of $8.5 million in Q2 2022 and a floor of $5.7 million in Q4 2025.
- Median Buildings over the past 5 years was $6.8 million (2023), compared with a mean of $7.2 million.
- Biggest five-year swings in Buildings: increased 1.42% in 2021 and later decreased 20.4% in 2023.
- Chicago Rivet & Machine's Buildings stood at $8.5 million in 2021, then dropped by 19.38% to $6.8 million in 2022, then increased by 0.26% to $6.8 million in 2023, then dropped by 10.83% to $6.1 million in 2024, then dropped by 6.74% to $5.7 million in 2025.
- The last three reported values for Buildings were $5.7 million (Q4 2025), $6.1 million (Q4 2024), and $6.1 million (Q3 2024) per Business Quant data.