Commercial Vehicle (CVGI) Construction in Progress (2016 - 2019)
Historic Construction in Progress for Commercial Vehicle (CVGI) over the last 10 years, with Q4 2019 value amounting to $13.0 million.
- Commercial Vehicle's Construction in Progress rose 9490.23% to $13.0 million in Q4 2019 from the same period last year, while for Dec 2019 it was $13.0 million, marking a year-over-year increase of 9490.23%. This contributed to the annual value of $13.0 million for FY2019, which is 9490.23% up from last year.
- As of Q4 2019, Commercial Vehicle's Construction in Progress stood at $13.0 million, which was up 9490.23% from $6.6 million recorded in Q4 2018.
- Over the past 5 years, Commercial Vehicle's Construction in Progress peaked at $13.0 million during Q4 2019, and registered a low of $2.7 million during Q4 2017.
- For the 5-year period, Commercial Vehicle's Construction in Progress averaged around $8.5 million, with its median value being $8.2 million (2016).
- As far as peak fluctuations go, Commercial Vehicle's Construction in Progress tumbled by 6716.0% in 2017, and later soared by 14767.23% in 2018.
- Quarter analysis of 5 years shows Commercial Vehicle's Construction in Progress stood at $11.8 million in 2015, then crashed by 31.0% to $8.2 million in 2016, then crashed by 67.16% to $2.7 million in 2017, then surged by 147.67% to $6.6 million in 2018, then soared by 94.9% to $13.0 million in 2019.
- Its Construction in Progress was $13.0 million in Q4 2019, compared to $6.6 million in Q4 2018 and $2.7 million in Q4 2017.