Commercial Vehicle (CVGI) Construction in Progress (2016 - 2019)
Commercial Vehicle (CVGI) has disclosed Construction in Progress for 9 consecutive years, with $13.0 million as the latest value for Q4 2019.
- On a quarterly basis, Construction in Progress rose 94.9% to $13.0 million in Q4 2019 year-over-year; TTM through Dec 2019 was $13.0 million, a 94.9% increase, with the full-year FY2019 number at $13.0 million, up 94.9% from a year prior.
- Construction in Progress was $13.0 million for Q4 2019 at Commercial Vehicle, up from $6.6 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $13.0 million in Q4 2019 to a low of $2.7 million in Q4 2017.
- A 4-year average of $7.6 million and a median of $7.4 million in 2016 define the central range for Construction in Progress.
- Peak YoY movement for Construction in Progress: tumbled 67.16% in 2017, then soared 147.67% in 2018.
- Commercial Vehicle's Construction in Progress stood at $8.2 million in 2016, then crashed by 67.16% to $2.7 million in 2017, then skyrocketed by 147.67% to $6.6 million in 2018, then skyrocketed by 94.9% to $13.0 million in 2019.
- Per Business Quant, the three most recent readings for CVGI's Construction in Progress are $13.0 million (Q4 2019), $6.6 million (Q4 2018), and $2.7 million (Q4 2017).