Csw Industrials (CSW) Work In Process (2017 - 2021)
Csw Industrials has reported Work In Process over the past 7 years, most recently at $6.4 million for Q1 2021.
- Quarterly results put Work In Process at $6.4 million for Q1 2021, up 4.76% from a year ago — trailing twelve months through Mar 2021 was $6.4 million (up 4.76% YoY), and the annual figure for FY2021 was $6.4 million, up 4.76%.
- Work In Process for Q1 2021 was $6.4 million at Csw Industrials, up from $6.1 million in the prior quarter.
- Over the last five years, Work In Process for CSW hit a ceiling of $6.5 million in Q1 2019 and a floor of $3.8 million in Q1 2018.
- Median Work In Process over the past 5 years was $6.3 million (2017), compared with a mean of $5.8 million.
- Biggest five-year swings in Work In Process: plummeted 40.11% in 2018 and later skyrocketed 72.6% in 2019.
- Csw Industrials' Work In Process stood at $6.3 million in 2017, then plummeted by 40.11% to $3.8 million in 2018, then soared by 72.6% to $6.5 million in 2019, then dropped by 6.28% to $6.1 million in 2020, then grew by 4.76% to $6.4 million in 2021.
- The last three reported values for Work In Process were $6.4 million (Q1 2021), $6.1 million (Q1 2020), and $6.5 million (Q1 2019) per Business Quant data.