Cps Technologies (CPSH) Construction in Progress (2016 - 2024)
Cps Technologies' Construction in Progress history spans 15 years, with the latest figure at $448184.0 for Q3 2024.
- For Q3 2024, Construction in Progress rose 116.84% year-over-year to $448184.0; the TTM value through Sep 2024 reached $448184.0, up 116.84%, while the annual FY2023 figure was $281629.0, 333.88% up from the prior year.
- Construction in Progress reached $448184.0 in Q3 2024 per CPSH's latest filing, down from $496331.0 in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $496331.0 in Q2 2024 to a low of $36172.0 in Q1 2021.
- Average Construction in Progress over 5 years is $210714.8, with a median of $214870.5 recorded in 2022.
- Peak YoY movement for Construction in Progress: tumbled 87.39% in 2021, then soared 516.63% in 2022.
- A 5-year view of Construction in Progress shows it stood at $61062.0 in 2020, then soared by 303.96% to $246669.0 in 2021, then tumbled by 73.69% to $64910.0 in 2022, then surged by 333.88% to $281629.0 in 2023, then soared by 59.14% to $448184.0 in 2024.
- Per Business Quant, the three most recent readings for CPSH's Construction in Progress are $448184.0 (Q3 2024), $496331.0 (Q2 2024), and $206250.0 (Q1 2024).