Growth Metrics

Cps Technologies (CPSH) Construction in Progress (2016 - 2024)

Cps Technologies (CPSH) has disclosed Construction in Progress for 15 consecutive years, with $448184.0 as the latest value for Q3 2024.

  • For the quarter ending Q3 2024, Construction in Progress rose 116.84% year-over-year to $448184.0, compared with a TTM value of $448184.0 through Sep 2024, up 116.84%, and an annual FY2023 reading of $281629.0, up 333.88% over the prior year.
  • Construction in Progress was $448184.0 for Q3 2024 at Cps Technologies, down from $496331.0 in the prior quarter.
  • Across five years, Construction in Progress topped out at $496331.0 in Q2 2024 and bottomed at $36172.0 in Q1 2021.
  • Average Construction in Progress over 5 years is $210714.8, with a median of $214870.5 recorded in 2022.
  • The sharpest move saw Construction in Progress tumbled 87.39% in 2021, then soared 516.63% in 2022.
  • Year by year, Construction in Progress stood at $61062.0 in 2020, then soared by 303.96% to $246669.0 in 2021, then tumbled by 73.69% to $64910.0 in 2022, then surged by 333.88% to $281629.0 in 2023, then soared by 59.14% to $448184.0 in 2024.
  • Business Quant data shows Construction in Progress for CPSH at $448184.0 in Q3 2024, $496331.0 in Q2 2024, and $206250.0 in Q1 2024.