Cps Technologies (CPSH) Construction in Progress (2016 - 2024)
Cps Technologies filings provide 15 years of Construction in Progress readings, the most recent being $448184.0 for Q3 2024.
- On a quarterly basis, Construction in Progress rose 116.84% to $448184.0 in Q3 2024 year-over-year; TTM through Sep 2024 was $448184.0, a 116.84% increase, with the full-year FY2023 number at $281629.0, up 333.88% from a year prior.
- Construction in Progress hit $448184.0 in Q3 2024 for Cps Technologies, down from $496331.0 in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $496331.0 in Q2 2024 to a low of $36172.0 in Q1 2021.
- Median Construction in Progress over the past 5 years was $214870.5 (2022), compared with a mean of $210714.8.
- Biggest five-year swings in Construction in Progress: crashed 87.39% in 2021 and later skyrocketed 516.63% in 2022.
- Cps Technologies' Construction in Progress stood at $61062.0 in 2020, then soared by 303.96% to $246669.0 in 2021, then tumbled by 73.69% to $64910.0 in 2022, then surged by 333.88% to $281629.0 in 2023, then soared by 59.14% to $448184.0 in 2024.
- The last three reported values for Construction in Progress were $448184.0 (Q3 2024), $496331.0 (Q2 2024), and $206250.0 (Q1 2024) per Business Quant data.