Cimpress (CMPR) Construction in Progress (2016 - 2025)
Cimpress has reported Construction in Progress over the past 11 years, most recently at $21.6 million for Q2 2025.
- Quarterly results put Construction in Progress at $21.6 million for Q2 2025, up 35.36% from a year ago — trailing twelve months through Jun 2025 was $21.6 million (up 35.36% YoY), and the annual figure for FY2025 was $21.6 million, up 35.36%.
- Construction in Progress for Q2 2025 was $21.6 million at Cimpress, up from $16.0 million in the prior quarter.
- Over the last five years, Construction in Progress for CMPR hit a ceiling of $21.6 million in Q2 2025 and a floor of $7.2 million in Q2 2021.
- Median Construction in Progress over the past 5 years was $15.0 million (2023), compared with a mean of $14.6 million.
- Biggest five-year swings in Construction in Progress: tumbled 32.65% in 2021 and later soared 81.12% in 2022.
- Cimpress' Construction in Progress stood at $7.2 million in 2021, then surged by 81.12% to $13.1 million in 2022, then increased by 14.26% to $15.0 million in 2023, then grew by 6.51% to $16.0 million in 2024, then skyrocketed by 35.36% to $21.6 million in 2025.
- The last three reported values for Construction in Progress were $21.6 million (Q2 2025), $16.0 million (Q2 2024), and $15.0 million (Q2 2023) per Business Quant data.