Columbus Mckinnon (CMCO) Construction in Progress (2017 - 2025)
Columbus Mckinnon's Construction in Progress history spans 14 years, with the latest figure at $9.0 million for Q1 2025.
- Quarterly Construction in Progress fell 61.47% to $9.0 million in Q1 2025 from the year-ago period, while the trailing twelve-month figure was $9.0 million through Mar 2025, down 61.47% year-over-year, with the annual reading at $9.0 million for FY2025, 61.47% down from the prior year.
- Construction in Progress came in at $9.0 million for Q1 2025, down from $23.4 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $23.4 million in Q1 2024 to a low of $9.0 million in Q1 2025.
- The 5-year median for Construction in Progress is $14.2 million (2021), against an average of $14.2 million.
- Year-over-year, Construction in Progress soared 126.47% in 2024 and then crashed 61.47% in 2025.
- Columbus Mckinnon's Construction in Progress stood at $14.2 million in 2021, then grew by 0.42% to $14.2 million in 2022, then dropped by 27.4% to $10.3 million in 2023, then skyrocketed by 126.47% to $23.4 million in 2024, then plummeted by 61.47% to $9.0 million in 2025.
- Per Business Quant, the three most recent readings for CMCO's Construction in Progress are $9.0 million (Q1 2025), $23.4 million (Q1 2024), and $10.3 million (Q1 2023).