Columbus Mckinnon (CMCO) Construction in Progress (2017 - 2025)
Columbus Mckinnon has reported Construction in Progress over the past 14 years, most recently at $9.0 million for Q1 2025.
- Quarterly results put Construction in Progress at $9.0 million for Q1 2025, down 61.47% from a year ago — trailing twelve months through Mar 2025 was $9.0 million (down 61.47% YoY), and the annual figure for FY2025 was $9.0 million, down 61.47%.
- Construction in Progress for Q1 2025 was $9.0 million at Columbus Mckinnon, down from $23.4 million in the prior quarter.
- Over the last five years, Construction in Progress for CMCO hit a ceiling of $23.4 million in Q1 2024 and a floor of $9.0 million in Q1 2025.
- Median Construction in Progress over the past 5 years was $14.2 million (2021), compared with a mean of $14.2 million.
- Biggest five-year swings in Construction in Progress: soared 126.47% in 2024 and later crashed 61.47% in 2025.
- Columbus Mckinnon's Construction in Progress stood at $14.2 million in 2021, then rose by 0.42% to $14.2 million in 2022, then fell by 27.4% to $10.3 million in 2023, then soared by 126.47% to $23.4 million in 2024, then crashed by 61.47% to $9.0 million in 2025.
- The last three reported values for Construction in Progress were $9.0 million (Q1 2025), $23.4 million (Q1 2024), and $10.3 million (Q1 2023) per Business Quant data.