Concrete Leveling Systems (CLEV) Operating Expenses (2010 - 2026)

Concrete Leveling Systems (CLEV) reported Operating Expenses of $17586.0 for Q2 2026, up 89.46% on a YoY basis from $9282.0 in Q2 2025, and up 28.33% sequentially from $13704.0 in Q1 2026.

Concrete Leveling Systems (CLEV) Operating Expenses (2010 - 2026) Analysis & Trends

Concrete Leveling Systems (CLEV) has 17 years of Operating Expenses data on file, last reported at $17586.0 in Q2 2026.

  • For the quarter ending Q2 2026, Operating Expenses rose 89.46% year-over-year to $17586.0; the trailing twelve-month figure through Apr 2026 stood at $76067.0 (up 47.45% YoY), and the FY2025 full-year result was $51597.0, up 4.56% from the prior year.
  • Operating Expenses climbed to $17586.0 in Q2 2026, from $13704.0 in the prior quarter.
  • In the past five years, Operating Expenses ranged from a high of $35020.0 in Q4 2025 to a low of $5833.0 in Q2 2022.
  • A 5-year average of $12765.9 and a median of $9753.0 in 2024 frame the typical range for Operating Expenses.
  • Across the five-year window, Operating Expenses fell 13.42% in 2022 and soared 89.46% in 2026, its largest moves.
  • Tracing CLEV's Operating Expenses over 5 years: stood at $18420.0 in 2022, then grew by 28.66% to $23699.0 in 2023, then dropped by 5.77% to $22331.0 in 2024, then jumped by 56.82% to $35020.0 in 2025, then slumped by 49.78% to $17586.0 in 2026.
  • Business Quant data shows CLEV's Operating Expenses at $17586.0 in Q2 2026, $13704.0 in Q1 2026, and $35020.0 in Q4 2025.

Peer Comparison

# Company Market Cap Enterprise Value Gross Profit (Qtr) Opex (Qtr)
1 Caterpillar 414.02 Bn 409.95 Bn 6.11 Bn 14.33 Bn
2 Deere 164.89 Bn 157.03 Bn 13.06 Bn 11.08 Bn
3 Paccar 68.81 Bn 67.93 Bn 1.36 Bn 5.65 Bn
4 CNH Industrial 13.19 Bn 11.63 Bn 1.22 Bn 701.00 Mn
5 Oshkosh 11.41 Bn 11.16 Bn 311.90 Mn 229.90 Mn
6 Agco 8.50 Bn 8.28 Bn 581.40 Mn 339.10 Mn
7 Terex 6.58 Bn 6.19 Bn 206.00 Mn 241.00 Mn
8 Greenpower Motor 3.53 Bn 3.53 Bn 1.26 Mn 1.29 Mn
9 Blue Bird 2.45 Bn 2.18 Bn 70.65 Mn 31.53 Mn
10 Concrete Leveling Systems 14.03 Mn 14.03 Mn 593.00 17,586.00

Historic Data

Download Data
DateValue
Apr 30, 2026 17,586.00
Jan 31, 2026 13,704.00
Oct 31, 2025 35,020.00
Jul 31, 2025 9,757.00
Apr 30, 2025 9,282.00
Jan 31, 2025 10,227.00
Oct 31, 2024 22,331.00
Jul 31, 2024 9,749.00
Apr 30, 2024 8,149.00
Jan 31, 2024 7,753.00
Oct 31, 2023 23,699.00
Jul 31, 2023 10,168.00
Apr 30, 2023 8,110.00
Jan 31, 2023 7,344.00
Oct 31, 2022 18,420.00
Jul 31, 2022 6,710.00
Apr 30, 2022 5,833.00
Jan 31, 2022 5,944.00
Oct 31, 2021 21,276.00
Jul 31, 2021 6,339.00