Cash Flow Statement
Growth Metrics

Clarus (CLAR) Construction in Progress (2016 - 2021)

Clarus filings provide 11 years of Construction in Progress readings, the most recent being $5.5 million for Q3 2021.

  • On a quarterly basis, Construction in Progress rose 119.1% to $5.5 million in Q3 2021 year-over-year; TTM through Sep 2021 was $5.5 million, a 119.1% increase, with the full-year FY2020 number at $3.0 million, up 80.0% from a year prior.
  • Construction in Progress hit $5.5 million in Q3 2021 for Clarus, up from $4.6 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $5.5 million in Q3 2021 to a low of $350000.0 in Q3 2017.
  • Median Construction in Progress over the past 5 years was $1.6 million (2019), compared with a mean of $1.8 million.
  • Biggest five-year swings in Construction in Progress: tumbled 50.21% in 2017 and later skyrocketed 185.67% in 2019.
  • Clarus' Construction in Progress stood at $721000.0 in 2017, then surged by 144.24% to $1.8 million in 2018, then fell by 4.03% to $1.7 million in 2019, then surged by 80.0% to $3.0 million in 2020, then surged by 80.64% to $5.5 million in 2021.
  • The last three reported values for Construction in Progress were $5.5 million (Q3 2021), $4.6 million (Q2 2021), and $3.5 million (Q1 2021) per Business Quant data.