Cash Flow Statement
Growth Metrics

Clarus (CLAR) Construction in Progress (2016 - 2021)

Clarus' Construction in Progress history spans 11 years, with the latest figure at $5.5 million for Q3 2021.

  • For Q3 2021, Construction in Progress rose 119.1% year-over-year to $5.5 million; the TTM value through Sep 2021 reached $5.5 million, up 119.1%, while the annual FY2020 figure was $3.0 million, 80.0% up from the prior year.
  • Construction in Progress reached $5.5 million in Q3 2021 per CLAR's latest filing, up from $4.6 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $5.5 million in Q3 2021 to a low of $350000.0 in Q3 2017.
  • Average Construction in Progress over 5 years is $1.8 million, with a median of $1.6 million recorded in 2019.
  • Peak YoY movement for Construction in Progress: plummeted 50.21% in 2017, then soared 185.67% in 2019.
  • A 5-year view of Construction in Progress shows it stood at $721000.0 in 2017, then surged by 144.24% to $1.8 million in 2018, then fell by 4.03% to $1.7 million in 2019, then surged by 80.0% to $3.0 million in 2020, then surged by 80.64% to $5.5 million in 2021.
  • Per Business Quant, the three most recent readings for CLAR's Construction in Progress are $5.5 million (Q3 2021), $4.6 million (Q2 2021), and $3.5 million (Q1 2021).