Compx International (CIX) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Compx International (CIX) over the last 17 years, with Q3 2025 value amounting to $540000.0.
- Compx International's Construction in Progress rose 246.68% to $540000.0 in Q3 2025 from the same period last year, while for Sep 2025 it was $540000.0, marking a year-over-year increase of 246.68%. This contributed to the annual value of $589000.0 for FY2024, which is 1286.98% down from last year.
- According to the latest figures from Q3 2025, Compx International's Construction in Progress is $540000.0, which was up 246.68% from $465000.0 recorded in Q2 2025.
- In the past 5 years, Compx International's Construction in Progress ranged from a high of $2.0 million in Q4 2021 and a low of $399000.0 during Q1 2023
- Its 5-year average for Construction in Progress is $846263.2, with a median of $676000.0 in 2023.
- In the last 5 years, Compx International's Construction in Progress skyrocketed by 12369.84% in 2021 and then tumbled by 7670.75% in 2023.
- Quarter analysis of 5 years shows Compx International's Construction in Progress stood at $2.0 million in 2021, then plummeted by 64.4% to $722000.0 in 2022, then decreased by 6.37% to $676000.0 in 2023, then fell by 12.87% to $589000.0 in 2024, then dropped by 8.32% to $540000.0 in 2025.
- Its last three reported values are $540000.0 in Q3 2025, $465000.0 for Q2 2025, and $524000.0 during Q1 2025.