China Health Industries Holdings, Inc. (CHHE) Construction in Progress (2016 - 2024)
China Health Industries Holdings (CHHE) has disclosed Construction in Progress for 14 consecutive years, with $421896.0 as the latest value for Q1 2024.
- For the quarter ending Q1 2024, Construction in Progress fell 26.42% year-over-year to $421896.0, compared with a TTM value of $421896.0 through Mar 2024, down 26.42%, and an annual FY2023 reading of $420092.0, down 27.5% over the prior year.
- Construction in Progress was $421896.0 for Q1 2024 at China Health Industries Holdings, down from $428652.0 in the prior quarter.
- Across five years, Construction in Progress topped out at $605886.0 in Q1 2022 and bottomed at $417518.0 in Q3 2023.
- Average Construction in Progress over 5 years is $524417.6, with a median of $551234.0 recorded in 2021.
- The sharpest move saw Construction in Progress plummeted 55.18% in 2020, then rose 9.91% in 2022.
- Year by year, Construction in Progress stood at $553498.0 in 2020, then rose by 2.67% to $568304.0 in 2021, then dropped by 0.17% to $567331.0 in 2022, then dropped by 24.44% to $428652.0 in 2023, then dropped by 1.58% to $421896.0 in 2024.
- Business Quant data shows Construction in Progress for CHHE at $421896.0 in Q1 2024, $428652.0 in Q4 2023, and $417518.0 in Q3 2023.