Growth Metrics

Century Aluminum (CENX) Construction in Progress (2016 - 2024)

Historic Construction in Progress for Century Aluminum (CENX) over the last 14 years, with Q4 2024 value amounting to $44.7 million.

  • Century Aluminum's Construction in Progress fell 7211.48% to $44.7 million in Q4 2024 from the same period last year, while for Dec 2024 it was $44.7 million, marking a year-over-year decrease of 7211.48%. This contributed to the annual value of $44.7 million for FY2024, which is 7211.48% down from last year.
  • According to the latest figures from Q4 2024, Century Aluminum's Construction in Progress is $44.7 million, which was down 7211.48% from $160.3 million recorded in Q4 2023.
  • Century Aluminum's 5-year Construction in Progress high stood at $160.3 million for Q4 2023, and its period low was $15.8 million during Q4 2020.
  • For the 5-year period, Century Aluminum's Construction in Progress averaged around $73.9 million, with its median value being $59.0 million (2022).
  • Per our database at Business Quant, Century Aluminum's Construction in Progress surged by 46708.86% in 2021 and then crashed by 7211.48% in 2024.
  • Quarter analysis of 5 years shows Century Aluminum's Construction in Progress stood at $15.8 million in 2020, then surged by 467.09% to $89.6 million in 2021, then tumbled by 34.15% to $59.0 million in 2022, then soared by 171.69% to $160.3 million in 2023, then tumbled by 72.11% to $44.7 million in 2024.
  • Its Construction in Progress stands at $44.7 million for Q4 2024, versus $160.3 million for Q4 2023 and $59.0 million for Q4 2022.