Century Aluminum (CENX) Construction in Progress (2016 - 2025)

Century Aluminum's Construction in Progress history spans 15 years, with the latest figure at $114.2 million for Q4 2025.

  • For Q4 2025, Construction in Progress rose 155.48% year-over-year to $114.2 million; the TTM value through Dec 2025 reached $114.2 million, up 155.48%, while the annual FY2025 figure was $114.2 million, 155.48% up from the prior year.
  • Construction in Progress reached $114.2 million in Q4 2025 per CENX's latest filing, up from $44.7 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $160.3 million in Q4 2023 to a low of $44.7 million in Q4 2024.
  • Average Construction in Progress over 5 years is $93.6 million, with a median of $89.6 million recorded in 2021.
  • Peak YoY movement for Construction in Progress: skyrocketed 467.09% in 2021, then crashed 72.11% in 2024.
  • A 5-year view of Construction in Progress shows it stood at $89.6 million in 2021, then plummeted by 34.15% to $59.0 million in 2022, then skyrocketed by 171.69% to $160.3 million in 2023, then plummeted by 72.11% to $44.7 million in 2024, then surged by 155.48% to $114.2 million in 2025.
  • Per Business Quant, the three most recent readings for CENX's Construction in Progress are $114.2 million (Q4 2025), $44.7 million (Q4 2024), and $160.3 million (Q4 2023).