KPIs & Operating Metrics(New)

Coeur Mining (CDE) Construction in Progress (2016 - 2025)

Coeur Mining's Construction in Progress history spans 16 years, with the latest figure at $129.7 million for Q4 2025.

  • Quarterly Construction in Progress fell 11.03% to $129.7 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $129.7 million through Dec 2025, down 11.03% year-over-year, with the annual reading at $129.7 million for FY2025, 11.03% down from the prior year.
  • Construction in Progress came in at $129.7 million for Q4 2025, down from $130.6 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $612.9 million in Q4 2023 to a low of $117.7 million in Q1 2025.
  • The 5-year median for Construction in Progress is $148.0 million (2021), against an average of $194.7 million.
  • Year-over-year, Construction in Progress skyrocketed 279.68% in 2021 and then tumbled 76.22% in 2024.
  • Coeur Mining's Construction in Progress stood at $148.0 million in 2021, then skyrocketed by 59.42% to $236.0 million in 2022, then skyrocketed by 159.67% to $612.9 million in 2023, then crashed by 76.22% to $145.7 million in 2024, then fell by 11.03% to $129.7 million in 2025.
  • Per Business Quant, the three most recent readings for CDE's Construction in Progress are $129.7 million (Q4 2025), $130.6 million (Q3 2025), and $134.9 million (Q2 2025).