KPIs & Operating Metrics(New)

Coeur Mining (CDE) Construction in Progress (2016 - 2025)

Coeur Mining has reported Construction in Progress over the past 16 years, most recently at $129.7 million for Q4 2025.

  • Quarterly results put Construction in Progress at $129.7 million for Q4 2025, down 11.03% from a year ago — trailing twelve months through Dec 2025 was $129.7 million (down 11.03% YoY), and the annual figure for FY2025 was $129.7 million, down 11.03%.
  • Construction in Progress for Q4 2025 was $129.7 million at Coeur Mining, down from $130.6 million in the prior quarter.
  • Over the last five years, Construction in Progress for CDE hit a ceiling of $612.9 million in Q4 2023 and a floor of $117.7 million in Q1 2025.
  • Median Construction in Progress over the past 5 years was $148.0 million (2021), compared with a mean of $194.7 million.
  • Biggest five-year swings in Construction in Progress: skyrocketed 279.68% in 2021 and later tumbled 76.22% in 2024.
  • Coeur Mining's Construction in Progress stood at $148.0 million in 2021, then soared by 59.42% to $236.0 million in 2022, then soared by 159.67% to $612.9 million in 2023, then tumbled by 76.22% to $145.7 million in 2024, then decreased by 11.03% to $129.7 million in 2025.
  • The last three reported values for Construction in Progress were $129.7 million (Q4 2025), $130.6 million (Q3 2025), and $134.9 million (Q2 2025) per Business Quant data.