KPIs & Operating Metrics(New)

Coeur Mining (CDE) Buildings (2016 - 2025)

Coeur Mining's Buildings history spans 16 years, with the latest figure at $1.7 billion for Q4 2025.

  • Quarterly Buildings rose 14.76% to $1.7 billion in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $1.7 billion through Dec 2025, up 14.76% year-over-year, with the annual reading at $1.7 billion for FY2025, 14.76% up from the prior year.
  • Buildings came in at $1.7 billion for Q4 2025, up from $1.7 billion in the prior quarter.
  • In the past five years, Buildings ranged from a high of $1.7 billion in Q4 2025 to a low of $668.1 million in Q4 2021.
  • The 5-year median for Buildings is $1.5 billion (2024), against an average of $1.4 billion.
  • Year-over-year, Buildings increased 1.28% in 2021 and then skyrocketed 60.13% in 2024.
  • Coeur Mining's Buildings stood at $668.1 million in 2021, then increased by 19.89% to $801.0 million in 2022, then rose by 18.29% to $947.4 million in 2023, then surged by 60.13% to $1.5 billion in 2024, then rose by 14.76% to $1.7 billion in 2025.
  • Per Business Quant, the three most recent readings for CDE's Buildings are $1.7 billion (Q4 2025), $1.7 billion (Q3 2025), and $1.7 billion (Q2 2025).