BlueLinx Holdings (BXC) Construction in Progress (2016 - 2019)
BlueLinx Holdings has reported Construction in Progress over the past 9 years, most recently at $1.7 million for Q4 2019.
- Quarterly results put Construction in Progress at $1.7 million for Q4 2019, up 53.37% from a year ago — trailing twelve months through Dec 2019 was $1.7 million (up 53.37% YoY), and the annual figure for FY2019 was $1.7 million, up 53.37%.
- Construction in Progress for Q4 2019 was $1.7 million at BlueLinx Holdings, up from $1.1 million in the prior quarter.
- Over the last five years, Construction in Progress for BXC hit a ceiling of $3.1 million in Q4 2016 and a floor of $255000.0 in Q1 2016.
- Median Construction in Progress over the past 5 years was $569500.0 (2017), compared with a mean of $880111.1.
- Biggest five-year swings in Construction in Progress: skyrocketed 1117.25% in 2016 and later tumbled 81.64% in 2017.
- BlueLinx Holdings' Construction in Progress stood at $296000.0 in 2015, then surged by 948.65% to $3.1 million in 2016, then tumbled by 81.64% to $570000.0 in 2017, then soared by 97.54% to $1.1 million in 2018, then surged by 53.37% to $1.7 million in 2019.
- The last three reported values for Construction in Progress were $1.7 million (Q4 2019), $1.1 million (Q4 2018), and $1.8 million (Q3 2018) per Business Quant data.