Growth Metrics

BlueLinx Holdings (BXC) Construction in Progress (2016 - 2019)

BlueLinx Holdings has reported Construction in Progress over the past 9 years, most recently at $1.7 million for Q4 2019.

  • For Q4 2019, Construction in Progress rose 53.37% year-over-year to $1.7 million; the TTM value through Dec 2019 reached $1.7 million, up 53.37%, while the annual FY2019 figure was $1.7 million, 53.37% up from the prior year.
  • Construction in Progress for Q4 2019 was $1.7 million at BlueLinx Holdings, up from $1.1 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $3.1 million in Q4 2016 and troughed at $255000.0 in Q1 2016.
  • A 5-year average of $880111.1 and a median of $569500.0 in 2017 define the central range for Construction in Progress.
  • Biggest five-year swings in Construction in Progress: surged 1117.25% in 2016 and later crashed 81.64% in 2017.
  • Year by year, Construction in Progress stood at $296000.0 in 2015, then soared by 948.65% to $3.1 million in 2016, then crashed by 81.64% to $570000.0 in 2017, then skyrocketed by 97.54% to $1.1 million in 2018, then soared by 53.37% to $1.7 million in 2019.
  • Business Quant data shows Construction in Progress for BXC at $1.7 million in Q4 2019, $1.1 million in Q4 2018, and $1.8 million in Q3 2018.