Bit Digital (BTBT) Construction in Progress (2023 - 2025)
Bit Digital's Construction in Progress history spans 3 years, with the latest figure at $43.1 million for Q3 2025.
- For Q3 2025, Construction in Progress changed N/A year-over-year to $43.1 million; the TTM value through Sep 2025 reached $43.1 million, changed N/A, while the annual FY2024 figure was $5.1 million, 89.96% down from the prior year.
- Construction in Progress for Q3 2025 was $43.1 million at Bit Digital, down from $70.1 million in the prior quarter.
- Across five years, Construction in Progress topped out at $70.1 million in Q2 2025 and bottomed at $5.1 million in Q4 2024.
- The 3-year median for Construction in Progress is $49.8 million (2025), against an average of $43.8 million.
- The largest YoY upside for Construction in Progress was 89.96% in 2024 against a maximum downside of 89.96% in 2024.
- A 3-year view of Construction in Progress shows it stood at $51.0 million in 2023, then plummeted by 89.96% to $5.1 million in 2024, then surged by 741.69% to $43.1 million in 2025.
- Per Business Quant, the three most recent readings for BTBT's Construction in Progress are $43.1 million (Q3 2025), $70.1 million (Q2 2025), and $49.8 million (Q1 2025).