Sierra Bancorp (BSRR) Construction in Progress: 2018-2019

  • Sierra Bancorp's Construction in Progress fell 95.12% to $44,000 in Q4 2019 from the same period last year, while for Dec 2019 it was $44,000, marking a year-over-year decrease of 95.12%. This contributed to the annual value of $44,000 for FY2019, which is 95.12% down from last year.
  • Per Sierra Bancorp's latest filing, its Construction in Progress stood at $44,000 for Q4 2019, which was down 95.12% from $901,000 recorded in Q4 2018.
  • In the past 5 years, Sierra Bancorp's Construction in Progress registered a high of $901,000 during Q4 2018, and its lowest value of $44,000 during Q4 2019.
  • Its 2-year average for Construction in Progress is $472,500, with a median of $472,500 in 2018.
  • Data for Sierra Bancorp's Construction in Progress shows a maximum YoY slumped of 95.12% (in 2019) over the last 5 years.
  • Quarterly analysis of 2 years shows Sierra Bancorp's Construction in Progress stood at $901,000 in 2018, then slumped by 95.12% to $44,000 in 2019.