Brown & Brown (BRO) Construction in Progress (2018 - 2020)
Brown & Brown (BRO) has disclosed Construction in Progress for 3 consecutive years, with $81.7 million as the latest value for Q4 2020.
- On a quarterly basis, Construction in Progress rose 114.9% to $81.7 million in Q4 2020 year-over-year; TTM through Dec 2020 was $81.7 million, a 114.9% increase, with the full-year FY2020 number at $81.7 million, up 114.9% from a year prior.
- Construction in Progress was $81.7 million for Q4 2020 at Brown & Brown, up from $38.0 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $81.7 million in Q4 2020 to a low of $7.6 million in Q4 2018.
- A 3-year average of $42.4 million and a median of $38.0 million in 2019 define the central range for Construction in Progress.
- Peak YoY movement for Construction in Progress: skyrocketed 402.58% in 2019, then soared 114.9% in 2020.
- Brown & Brown's Construction in Progress stood at $7.6 million in 2018, then surged by 402.58% to $38.0 million in 2019, then skyrocketed by 114.9% to $81.7 million in 2020.
- Per Business Quant, the three most recent readings for BRO's Construction in Progress are $81.7 million (Q4 2020), $38.0 million (Q4 2019), and $7.6 million (Q4 2018).