Growth Metrics

Brown & Brown (BRO) Construction in Progress (2018 - 2020)

Historic Construction in Progress for Brown & Brown (BRO) over the last 3 years, with Q4 2020 value amounting to $81.7 million.

  • Brown & Brown's Construction in Progress rose 11489.68% to $81.7 million in Q4 2020 from the same period last year, while for Dec 2020 it was $81.7 million, marking a year-over-year increase of 11489.68%. This contributed to the annual value of $81.7 million for FY2020, which is 11489.68% up from last year.
  • As of Q4 2020, Brown & Brown's Construction in Progress stood at $81.7 million, which was up 11489.68% from $38.0 million recorded in Q4 2019.
  • In the past 5 years, Brown & Brown's Construction in Progress registered a high of $81.7 million during Q4 2020, and its lowest value of $7.6 million during Q4 2018.
  • Its 3-year average for Construction in Progress is $42.4 million, with a median of $38.0 million in 2019.
  • As far as peak fluctuations go, Brown & Brown's Construction in Progress surged by 40257.66% in 2019, and later surged by 11489.68% in 2020.
  • Brown & Brown's Construction in Progress (Quarter) stood at $7.6 million in 2018, then skyrocketed by 402.58% to $38.0 million in 2019, then skyrocketed by 114.9% to $81.7 million in 2020.
  • Its last three reported values are $81.7 million in Q4 2020, $38.0 million for Q4 2019, and $7.6 million during Q4 2018.