Bunker Hill Mining (BHLL) Receivables (2017 - 2018)
Bunker Hill Mining's Receivables history spans 2 years, with the latest figure at $56159.0 for Q1 2018.
- For Q1 2018, Receivables changed N/A year-over-year to $56159.0; the TTM value through Mar 2018 reached $56159.0, changed N/A, while the annual FY2017 figure was $5474.0, N/A changed from the prior year.
- Receivables reached $56159.0 in Q1 2018 per BHLL's latest filing, up from $6402.0 in the prior quarter.
- In the past five years, Receivables ranged from a high of $56159.0 in Q1 2018 to a low of $5474.0 in Q2 2017.