Biglari Holdings (BH) Construction in Progress (2017 - 2025)
Biglari Holdings has reported Construction in Progress over the past 9 years, most recently at $2.2 million for Q4 2025.
- Quarterly results put Construction in Progress at $2.2 million for Q4 2025, up 226.64% from a year ago — trailing twelve months through Dec 2025 was $2.2 million (up 226.64% YoY), and the annual figure for FY2025 was $2.2 million, up 226.64%.
- Construction in Progress for Q4 2025 was $2.2 million at Biglari Holdings, down from $2.5 million in the prior quarter.
- Over the last five years, Construction in Progress for BH hit a ceiling of $5.7 million in Q3 2022 and a floor of $346000.0 in Q3 2024.
- Median Construction in Progress over the past 5 years was $1.5 million (2021), compared with a mean of $2.0 million.
- Biggest five-year swings in Construction in Progress: plummeted 78.47% in 2023 and later soared 608.67% in 2025.
- Biglari Holdings' Construction in Progress stood at $2.8 million in 2021, then dropped by 20.5% to $2.2 million in 2022, then decreased by 27.21% to $1.6 million in 2023, then plummeted by 58.75% to $672000.0 in 2024, then surged by 226.64% to $2.2 million in 2025.
- The last three reported values for Construction in Progress were $2.2 million (Q4 2025), $2.5 million (Q3 2025), and $1.3 million (Q2 2025) per Business Quant data.