Growth Metrics

Butterfly Network (BFLY) Restructuring Costs (2022 - 2024)

Butterfly Network's Restructuring Costs history spans 3 years, with the latest figure at $422000.0 for Q3 2024.

  • For Q3 2024, Restructuring Costs fell 90.6% year-over-year to $422000.0; the TTM value through Sep 2024 reached $2.7 million, down 78.79%, while the annual FY2023 figure was $9.5 million, 77.64% up from the prior year.
  • Restructuring Costs for Q3 2024 was $422000.0 at Butterfly Network, down from $580000.0 in the prior quarter.
  • Across five years, Restructuring Costs topped out at $4.5 million in Q3 2023 and bottomed at $249000.0 in Q4 2023.
  • The 3-year median for Restructuring Costs is $1.0 million (2022), against an average of $1.6 million.
  • The largest YoY upside for Restructuring Costs was 1025.6% in 2023 against a maximum downside of 92.56% in 2023.
  • A 3-year view of Restructuring Costs shows it stood at $3.3 million in 2022, then crashed by 92.56% to $249000.0 in 2023, then soared by 69.48% to $422000.0 in 2024.
  • Per Business Quant, the three most recent readings for BFLY's Restructuring Costs are $422000.0 (Q3 2024), $580000.0 (Q2 2024), and $1.4 million (Q1 2024).