Brookfield Renewable Partners (BEP) Construction in Progress (2016 - 2025)
Brookfield Renewable Partners' Construction in Progress history spans 10 years, with the latest figure at $6.2 billion for Q4 2025.
- For Q4 2025, Construction in Progress fell 4.85% year-over-year to $6.2 billion; the TTM value through Dec 2025 reached $6.2 billion, down 4.85%, while the annual FY2025 figure was $6.2 billion, 4.85% down from the prior year.
- Construction in Progress reached $6.2 billion in Q4 2025 per BEP's latest filing, down from $6.6 billion in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $6.6 billion in Q4 2024 to a low of $1.2 billion in Q4 2021.
- Average Construction in Progress over 5 years is $4.5 billion, with a median of $4.9 billion recorded in 2023.
- Peak YoY movement for Construction in Progress: soared 171.56% in 2022, then fell 4.85% in 2025.
- A 5-year view of Construction in Progress shows it stood at $1.2 billion in 2021, then soared by 171.56% to $3.3 billion in 2022, then soared by 47.54% to $4.9 billion in 2023, then surged by 33.38% to $6.6 billion in 2024, then dropped by 4.85% to $6.2 billion in 2025.
- Per Business Quant, the three most recent readings for BEP's Construction in Progress are $6.2 billion (Q4 2025), $6.6 billion (Q4 2024), and $4.9 billion (Q4 2023).