Bridger Aerospace Group Holdings (BAERW) Construction in Progress (2022 - 2023)
Bridger Aerospace Group Holdings' (BAERW) quarterly Construction in Progress came in at $15.2 million in Q1 2023, up 10.44% quarter-over-quarter from $13.8 million in Q4 2022.
Analysis
Bridger Aerospace Group Holdings (BAERW) Construction in Progress (2022 - 2023) Analysis & Trends
Bridger Aerospace Group Holdings (BAERW) has reported Construction in Progress for 2 consecutive years, with $15.2 million the latest figure, recorded in Q1 2023.
- On a quarterly basis, Construction in Progress changed N/A year-over-year to $15.2 million in Q1 2023; TTM through Mar 2023 was $15.2 million, a N/A change from a year earlier, with the FY2022 full-year figure at $13.8 million, changed N/A from the prior year.
- Construction in Progress was $15.2 million for Q1 2023 at Bridger Aerospace Group Holdings, up from $13.8 million in the prior quarter.
- Over five years, Construction in Progress peaked at $15.2 million in Q1 2023 and troughed at $13.8 million in Q4 2022.
Peer Set
Peer Comparison
| # | Company | Market Cap | Enterprise Value | Gross Profit (Qtr) | Construction in Progress (Qtr) |
|---|---|---|---|---|---|
| 1 | Rtx | 267.14 Bn | 258.84 Bn | 9.91 Bn | - |
| 2 | Boeing | 163.65 Bn | 143.63 Bn | 2.41 Bn | - |
| 3 | Howmet Aerospace | 93.36 Bn | 92.80 Bn | 951.00 Mn | - |
| 4 | Honeywell International | 65.01 Bn | 55.81 Bn | 3.65 Bn | - |
| 5 | TransDigm | 64.58 Bn | 61.80 Bn | 1.63 Bn | - |
| 6 | Heico | 43.72 Bn | 43.48 Bn | 580.99 Mn | 31.45 Mn |
| 7 | AerCap Holdings | 24.34 Bn | 24.34 Bn | - | - |
| 8 | Woodward | 20.10 Bn | 19.62 Bn | 349.91 Mn | - |
| 9 | FTAI Aviation | 19.00 Bn | 18.66 Bn | 317.30 Mn | - |
| 10 | Bridger Aerospace Group Holdings | 10.57 Mn | 424.72 Mn | 11.32 Mn | - |