Avai Bio (AVAI) Construction in Progress (2018 - 2023)
Avai Bio's Construction in Progress history spans 4 years, with the latest figure at $8361.0 for Q2 2023.
- For Q2 2023, Construction in Progress changed N/A year-over-year to $8361.0; the TTM value through Jun 2023 reached $8361.0, changed N/A, while the annual FY2023 figure was $8361.0, N/A changed from the prior year.
- Construction in Progress for Q2 2023 was $8361.0 at Avai Bio, roughly flat from $8361.0 in the prior quarter.
- Across five years, Construction in Progress topped out at $97400.0 in Q3 2019 and bottomed at $8361.0 in Q2 2019.
- The 3-year median for Construction in Progress is $97400.0 (2019), against an average of $57827.1.
- The largest annual shift saw Construction in Progress decreased 18.52% in 2019 before it surged 1064.93% in 2020.
- A 3-year view of Construction in Progress shows it stood at $8361.0 in 2019, then soared by 1064.93% to $97400.0 in 2020, then tumbled by 91.42% to $8361.0 in 2023.
- Per Business Quant, the three most recent readings for AVAI's Construction in Progress are $8361.0 (Q2 2023), $8361.0 (Q1 2023), and $97400.0 (Q4 2020).