Growth Metrics

Covista Inc. (ATGE) Construction in Progress (2016 - 2019)

Covista (ATGE) has disclosed Construction in Progress for 11 consecutive years, with $16.2 million as the latest value for Q2 2019.

  • Quarterly Construction in Progress fell 36.03% to $16.2 million in Q2 2019 from the year-ago period, while the trailing twelve-month figure was $16.2 million through Jun 2019, down 36.03% year-over-year, with the annual reading at $16.2 million for FY2019, 36.03% down from the prior year.
  • Construction in Progress for Q2 2019 was $16.2 million at Covista, down from $16.4 million in the prior quarter.
  • The five-year high for Construction in Progress was $32.3 million in Q1 2015, with the low at $15.4 million in Q4 2016.
  • Average Construction in Progress over 5 years is $22.8 million, with a median of $22.8 million recorded in 2016.
  • The sharpest move saw Construction in Progress plummeted 52.19% in 2016, then skyrocketed 83.32% in 2018.
  • Over 5 years, Construction in Progress stood at $32.2 million in 2015, then tumbled by 52.19% to $15.4 million in 2016, then skyrocketed by 70.51% to $26.2 million in 2017, then dropped by 11.78% to $23.1 million in 2018, then decreased by 29.88% to $16.2 million in 2019.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $16.2 million, $16.4 million, and $23.1 million for Q2 2019, Q1 2019, and Q4 2018 respectively.