Astrotech (ASTC) Construction in Progress (2011 - 2012)

Astrotech (ASTC) posted quarterly Construction in Progress of $930000.0 for Q2 2012, up 367.34% year-over-year from $199000.0 in Q3 2011, and up 367.34% on a QoQ basis from $199000.0 in Q2 2011.

Astrotech (ASTC) Construction in Progress (2011 - 2012) Analysis & Trends

Astrotech (ASTC) has reported Construction in Progress for 2 consecutive years, with $930000.0 the latest figure, recorded in Q2 2012.

  • In Q2 2012, Construction in Progress rose 367.34% year-over-year to $930000.0; the TTM figure through Jun 2012 stood at $930000.0 (up 367.34% YoY), while the FY2012 annual figure was $930000.0, up 367.34% from the prior year.
  • Construction in Progress came in at $930000.0 for Q2 2012 at Astrotech, up from $199000.0 in the prior quarter.
  • The five-year high for Construction in Progress was $930000.0 in Q2 2012, with the low at $199000.0 in Q2 2011.

Peer Comparison

# Company Market Cap Enterprise Value Gross Profit (Qtr) Construction in Progress (Qtr)
1 Coherent 3,591.32 Bn 3,590.02 Bn 679.95 Mn -
2 Novanta 69.39 Bn 69.00 Bn 113.58 Mn -
3 Keysight Technologies 57.75 Bn 55.57 Bn 995.00 Mn -
4 Teledyne Technologies 30.63 Bn 30.33 Bn 673.80 Mn -
5 Fortive 19.14 Bn 18.79 Bn 675.50 Mn -
6 Trimble 12.33 Bn 12.10 Bn 646.30 Mn -
7 Cognex 11.87 Bn 11.58 Bn 190.94 Mn -
8 Sensata Technologies Holding 6.78 Bn 6.14 Bn 286.30 Mn -
9 Garmin 4.63 Bn 1.93 Bn 1.04 Bn -
10 Astrotech 19.81 Mn 13.21 Mn 67,000.00 -

Historic Data

Download Data
DateValue
Jun 30, 2012 930,000.00
Jun 30, 2011 199,000.00