Growth Metrics

Southeast Airport (ASR) Times Interest Earned (2017)

Southeast Airport has reported Times Interest Earned over the past 1 years, most recently at $11576.8 for Q4 2017.

  • Quarterly Times Interest Earned changed N/A to $11576.8 in Q4 2017 from the year-ago period, while the trailing twelve-month figure was $4036.0 through Sep 2018, changed N/A year-over-year, with the annual reading at $11.07 for FY2025, 47.77% down from the prior year.
  • Times Interest Earned was $11576.8 for Q4 2017 at Southeast Airport.
  • Over five years, Times Interest Earned peaked at $11576.8 in Q4 2017 and troughed at $11576.8 in Q4 2017.